GROUP Contractors’ Pile Division services a growing list of clients in the Industrial, Commercial and Manufacturing industries and specializes in the installation of Displacement Piles, Sheet Piles, and Non-Displacement Piles. GROUP uses the highest quality equipment including hydraulic Lattice Boom Crawler Cranes which are self erecting and cost-effective. Equipped with hydraulic leadspotters, these cranes are the safest on the market and are equipped with load computers to prevent unsafe lifts.

DISPLACEMENT PILES
  • Pre-cast Concrete
  • Steel Pipe
  • Steel H-Piles
  • Limited Access Piling
SHEET PILES
  • Cofferdams
  • Bulkheads
  • Earth Retention
NON-DISPLACEMENT PILES
  • Augered Cast-in-Place (ACIP)
  • Limited Access Piling
Owner Project Name Amount
Motiva / Shell Enterprises Bechtel / Jacobs JV Construction of more than 100,000 linear feet of 14" H piling ranging in length from 85 to 100 feet. Also, 400 18" ACIP ranging in depth from 40 to 85 feet. Over 4,000 wall feet of earth retention with excavations ranging in depths from 10 feet to 30 feet. Bechtel / Jacobs JV $15,300,000
County of Arlington, Virginia WWTP - Alberici CorporationConstruction of more than 100,000 linear feet of 14" H piling ranging in length from 85 to 100 feet. Also, 400 18" ACIP ranging in depth from 40 to 85 feet. Over 4,000 wall feet of earth retention with excavations ranging in depths from 10 feet to 30 feet. WWTP - Alberici Corporation $15,200,000
Perkins Rowe Corporation Echelon ConstructionThis project included installation of over 210 wall feet of sheet piling and an additional 1205 14 x 60 concrete piles for four commercial buildings on large development that includes medical building, parking garage, condo development and shopping mall. Echelon Construction $ 2,450,000
State of Louisiana Walton Construction - 19th Judicial CourthouseThis project includes driven piles, large civil construction for foundations and earth work on the new 19th Judicial Courthouse in downtown Baton Rouge. Walton Construction - 19th Judicial Courthouse $ 2,019,999
Air Liquide DSite Preparation and Auger Cast Piles for ACU#3 UnitGroup Contractors bath-tubbed site, installed over 450 auger cast piles and sealed slabs in bath-tub area. Site Preparation and Auger Cast Piles for ACU#3 Unit $ 1,800,000
Oxy Chem Refinery Oxy Chem Coffer DamProject consisted of a coffer dam which included over 400 wall feet of sheeting. Scope also included over 700 Timber Piles 30 to 65 feet long and over 600 Concrete Piles 40 feet in depth. 32 limited access piles 50 feet in depth were also part of the project. Oxy Chem Coffer Dam $ 1,700,000
Criterion Port Allen S & B EngineersWorking as the piling sub-contractor for S&B Engineers, and as a sub-contractor for James Construction Group on this project at Shell Refinery in Port Allen, LA. In total, almost 1200 concrete piles are being driven, along with both a compression test and a tention test being performed as part of the scope. S & B Engineers $ 1,295,000
MI Swaco MI SwacoThis project was a drive only, owner provided material, as we drove over 5,100 Class B Timber Piles. MI Swaco $ 1,275,000
Pennington Biomedical Piles for New Office & Lab BuildingGROUP Contractors installed over 400 lf of steel piles for the foundation for the New Office and Lab Building at the Pennington Biomedical Center in Baton Rouge, LA. Piles for New Office & Lab Building $ 1,250,000
Echelon Corporation Perkins Rowe Pre-Cast & Sheet PilingThis particular project includes the installation of pre-cast concrete piles and sheet piles. Perkins Rowe Pre-Cast & Sheet Piling $ 1,000,000
Angelle Concrete Company Angelle Concrete Loading DockProject scope included piling, large diameter drilled shaft, bulkhead, large foundation for loading dock facility at concrete terminal. Angelle Concrete Loading Dock $ 710,000
Angelle Concrete Company Angelle Concrete SiloProject was completed for a concrete silo storage at a loading facility. Included foundations, bulkhead, piling and fast track scheduling. Angelle Concrete Silo $ 650,000

drillit

GROUP Contractors has invested in state-of-the-art equipment to service a variety of drilling needs for Industrial, Environmental and Commercial clients. From drilling only services to turnkey operations, GROUP has experience with switchyards, transmission structures, tower foundations, building foundations, and piling pre-drilling. GROUP’s drilling superintendents are experts in their field with unparalleled experience and expertise.

  • INDUSTRIAL – Foundation Shafts
  • MANUFACTURING FACILITIES
  • BUILDING FOUNDATION SHAFTS
  • COMMUNICATION TOWERS
  • TRANSMISSION AND SUBSTATION FOUNDATIONS
  • ENVIRONMENTAL
  • LIMITED ACCESS
  • DRILL ONLY OR TURNKEY – Industrial or Commercial
Owner Project Name Amount
Motiva Enterprises Wet Gas Scrubber Unit AdditionThis project is a combination of Drilled Shafts and Foundations. Poured over 4000 cubic yards of drilled shafts on 400 plus holes along with 5000 yards of concrete foundations and 600 hundred tons of resteel. This project utilized (3) of GROUPS company owned Lodril rigs simultaneously. The project team was comprised of (3) drill crews as well as support personel. GROUP also utilized its direct hire civil crews, whose responsiblities were to form the large foundations on top of the shafts. Wet Gas Scrubber Unit Addition $5,000,000
IMTT CDIIncluded over 400 drilled shafts and large foundations at Industrial facility in South Louisiana. Over 5,000 cubic yards of concrete included in foundations were part of scope. CDI $2,555,000
State of Louisiana Walton Construction - 19th Judicial CourthouseThis project includes driven piles, large civil construction for foundations and earth work on the new 19th Judicial Courthouse in downtown Baton Rouge. Walton Construction - 19th Judicial Courthouse $2,019,999
EP Breaux Electrical EP Breaux Jack Creek Sub-StationThis scope included over 300 drilled piers at an eletrical sub-station. EP Breaux Jack Creek Sub-Station $ 900,500
Mississippi Power & Light Leatherwood Energy StationAs is typical in the industrial markets this project needed to be constructed on a fast track schedule. The scope required turnkey installation of both large and small diameter shaft foundations along with numerous spread footing designs, all within close proximity of other subcontractors and electrical distribution towers. Given that the site was at a remote area and roads were still undeveloped, GROUP elected to use our track mounted LoDril. This equipment allowed us to continue work after torrential rains, which kept down time to a minimum. As mobilization was taking place, GROUP began prefabrication of many forms, which allowed for consistent and high production rates. Even though some drilling required the use of environmentally safe drilling fluids, excellent planning helped maintain schedule. Thanks to efficient supervision and hard working crews, GROUP was able to complete placement of over 2,000 cubic yards of concrete without incident or error in under the scheduled time. Leatherwood Energy Station $ 760,250
Angelle Concrete Company Angelle Concrete Loading DockProject scope included piling, large diameter drilled shaft, bulkhead, large foundation for loading dock facility at concrete terminal. Angelle Concrete Loading Dock $ 710,000
Cleco Wells Substation 500/230 kvElectrical substation which GROUP drilled approximately 700 shafts with caps and anchor bolts. There was over 4000 cubic yards of concrete used in this application. Several of the transmission line holes were 8ft in diameter. This client continues to utilize GROUP's drilling services for projects multiple times per year. Wells Substation 500/230 kv $ 700,000
EP Breaux EP Breaux Shelby Sub-StationIncluded 171 bell bottom drilled shafts. EP Breaux Shelby Sub-Station $ 567,000
Citgo Petroleum LSM Limited Access Drilled ShaftsIncluded 171 bell bottom drilled shafts. LSM Limited Access Drilled Shafts $ 500,000
EP Breaux Electrical EP Breaux Tontitown Arkansas SubstationScope included large foundations for electrical sub-station and large diameter drilled shafts in Arkansas. EP Breaux Tontitown Arkansas Substation $ 475,000
Louisiana Pigment Performance ContractorsScope included large foundations for electrical sub-station and large diameter drilled shafts in Arkansas. Performance Contractors $ 380,000
Exxon Co. USA Exxon Tank FarmWith the addition of a rail spur to support production, Exxon required that the new tracks enter the plant without disrupting existing units. Although this was the least developed route, over twenty pipelines had to be crossed. Through close participation with the railroad and the engineers, GROUP installed seven bridges with shaft and mat foundations in less than the allotted time. Some crossings required the use of limited access rigs as transmission line were less than twenty feet overhead. Exxon Tank Farm $ 340,000
Blue Cross & Blue Shield of Louisiana Buquet & LeBlanc General Contractors This project included drilled shafts of varying depths for commercial site and also included a fast track approach working in conjuction with the General Contractor. Buquet & LeBlanc General Contractors $ 285,000
EP Breaux Electrical EP Breaux Cane BayouConstruction scope was inclusive of 183 drilled shafts and foundations. EP Breaux Cane Bayou $ 255,000
Holcim Holcim at Holly Hill, S.C.This work was done in South Carolina and included large diameter drilled shafts. Holcim at Holly Hill, S.C. $ 245,000
EL Paso Electric EP BreauxThis work entailed 63 large diameter drilled shafts and foundations for electrical sub-station located in El Paso, TX. EP Breaux $ 244,000
Motiva Enterprises Clarifier AdditionGROUP drilled the shafts for the clarifier tank foundation as well as the pipe rack support foundations. This project wwas completed ahead of schedule. Clarifier Addition $ 224,550
Healing Place Church Percy Matherne General ContractorsScope included drilled shafts of varying depths and diameters for large site working with General Contractor developing a new Church in Baton Rouge, Louisiana. Percy Matherne General Contractors $ 210,000
Occidental Chemical Corporation Recovery WellsOccidental Chemical was in need of a recovery well to discharge any contaminated groundwater. GROUP was instrumental in assisting Occidental Chemical with several value engineering options.

The final design included two recovery wells which were installed by GROUP. This consisted of installing a pourous sheild in a permenant casing to allow infiltration of groundwater which could be displaced by Occidental.
Recovery Wells $ 170,000
Shintech Enterprises EP Breaux at ShintechIncluded over 40 large diameter drilled shafts and foundations at new industrial facility in West Baton Rouge Parish. EP Breaux at Shintech $ 165,000
St. James Crude Oil Shaw ConstructorsIncluded large diameter drilled shafts. Shaw Constructors $ 142,000
Exxon Mobil Performance ContractorsScope of work included drilled shafts and foundations at industrial facility in Baton Rouge, Louisiana. Performance Contractors $ 135,000